Kashmir Faces 500 MW Power Shortfall as Peak Demand Touches 2400 MW
More receiving stations in the pipeline; KPDCL meets seasons highest load at 1900 MWs; 60% areas under local Discom flat rated Srinagar, Dec 02 : The Power Development Department (PDD) is facing a ‘shortage of nearly 500 Megawatts (MWs) to meet the actual power demand’ in Kashmir valley— plunging residents facing into extended blackouts. An official…
